US Commerce Secretary Lutnick criticises those who oppose data centres

Newsquawk StaffPublished On the live feed at 11:038 more headlines followed before this page went public
Newsquawk headlines
11:06

BOC PREVIEW: BoC Rate Decision and Governor Statement due at 14:45BST/09:45EDT; Expected to hold rates at 2.25%

11:05

Teva (TEVA) announces positive topline results from Phase 2a study in celiac disease for its Anti-Il-15; study met primary endpoint

11:03

US Commerce Secretary Lutnick criticises those who oppose data centres

11:00

US MBA Mortgage Applications (Aug/28) 0.8% (Prev. -1.0%)

11:00

US MBA 30-Year Mortgage Rate (Aug/28) 6.79% (Prev. 6.78%)

Open the platform and use it. The whole workspace is free to try, with no signup and no card. When you want the headlines arriving live instead of on a delay, Newsquawk Pro is £24.99 for 7 days.

Free. No signup, no card.
Context

Cabinet-level commentary defending data centre construction fits a recurring pattern in which the administration signals its posture toward AI infrastructure before any formal rulemaking exists, and the signal matters because siting, power hookups, and permitting sit across federal, state, and local jurisdictions rather than in one regulator's hands. The Commerce remit here is indirect: the department's leverage runs through trade policy, export controls on compute, and industrial subsidy programmes rather than through planning permission, so remarks of this kind read as political positioning ahead of fights that are typically resolved at state utility commissions and local zoning boards. Episodes of this kind have tended to matter for the power and grid complex more than for the data centre operators themselves, since the binding constraint in past build-outs has been electricity supply and interconnection queues rather than permission to build. The actors worth tracking are the counterparty in the criticism, whether environmental opposition, local governments, or grid operators, since the identity of the opposition determines which channel the dispute runs through. The follow-ons are any concrete policy attached to the rhetoric: permitting acceleration, energy policy aimed at data centre load, or federal pre-emption of local siting decisions. As commentary without an attached measure, the read is directional on administrative intent rather than actionable.

Related headlines

The whole workspace, free to try.

Try it free